DALIAN BEILIANG GRAIN TERMINAL

PHASE 4 DEVELOPMENT

Incorporating Four CircPH3low Fumigation Recirculation Systems



The fourth phase of Beiliang's development gave a relatively small increase in the terminal's storage capacity, being only 18 interconnected silos 15.25 metres diameter and 45 metres high. GTS installed four CircPH3low systems connected to all 18 of these silos plus the eight "star bins" at the interstices between the main bins. Construction of the Phase 4 silos began in 2002 and was completed in 2005.

GTS's CircPH3low and gas mixing systems incorporated all the Phase 3 refinements plus some additional ones including a heated PH3 regulator for prevention of polymer formation and an integrated two-sided wall-mounted panel with the CO2 vaporizer on one side and the PH3 mixing system on the other.

Click on images below for enlargements

Beiliang Gang Grain Terminal - Phase 4 silos at left with Phase 3 silos at right.

PH3 Regulator with rear mounted heater



Electric heater on back of PH3 Regulator



Integrated wall panel with CO2 vaporizing system (top)
and PH3 mixing system (bottom)
 


Mixing System Control Panel




SIROCIRC®Dispenser Panel



Inside of SIROCIRC® Controller